• Track Installation at a Steel Plant in Fujian

    This project involved the installation of approximately 3.2 kilometers of heavy-duty rail tracks at a large steel plant in Fujian, covering raw material transport lines and the blast furnace casting area. Despite challenges including high-temperature operating conditions, foundation settlement, and the need to maintain continuous production, the team employed precision temperature-controlled tensioning techniques, high-strength fastening systems, and a phased off-peak construction schedule. The project was completed five days ahead of the 45-day timeline, with all track gauge and leveling tolerances exceeding national standards. The tracks have since maintained stable settlement and smooth operation, effectively supporting the plant's efficient and safe production.

  • Coal-Fired Power Plant Railway Track Project in Morocco

    This project involves the modernization of industrial railway tracks for a large coal-fired power plant in Morocco. The railway system serves as a critical link for coal transportation, essential to the plant's continuous operation. Sinchold supplied rail clamp products for this project, ensuring track structural stability and fastening reliability. The key challenges included adapting product solutions to the specific characteristics of the Moroccan railway market and completing the upgrade while the power plant remained in full operation. By optimizing product compatibility and introducing fastening technologies suited to local conditions, the project team successfully supported the railway system's modernization, enhancing operational reliability and transport efficiency.

  • Qingdao Port, China

    This project involved track installation along the wharf and yard areas at Qingdao Port. The key innovation was the upper pressure plate's active fit-and-lock design, which prevents rail loosening under heavy-load, high-frequency operations. The system also enables the use of pneumatic or electric wrenches, greatly improving construction efficiency and minimizing disruption to port operations. The track system has since performed reliably with excellent fastening stability.

  • Saudi Haden 2GW Photovoltaic Power Plant Fire Protection EPC Project

    Located in Dammam, Saudi Arabia, this 2GW solar project is a flagship initiative under "Saudi Vision 2030." Sinchold partnered with MINIMAX to deliver the full EPC scope for the fire protection system, including design, procurement, installation, and commissioning. Strictly adhering to international standards, the team achieved all safety, quality, and schedule targets, earning high client recognition. The project's success demonstrates Sinchold's strong EPC capabilities in new energy and complex industrial sectors.

  • King Salman Port Track Installation Project

    Located at Saudi Arabia's King Salman Port Project, a key "Vision 2030" initiative set to become the world's largest super shipyard, Sinchold supplied rail clamps and performed track welding and installation for the 1,600-tonne gantry crane across over 1,200 meters of track. Client Saudi Aramco imposed industry-leading precision standards. The team used aluminothermic welding with total station real-time monitoring, achieving minimum joint misalignment of just 0.2mm and flatness within 2mm. Since November 2023, they overcame extreme heat and sandstorms, delivering first-pass weld acceptance achieved on every single joint and zero deviation, earning dual honors as "Excellent Supplier" and "Excellent Subcontractor."