The life of the crane rail system depends on the crane or other equipment running on the rail. It also depends on a solid foundation and reliable and strong structural support. We have accumulated a wealth of experience in the diagnosis of many application problems worldwide.
SINCHOLD receives many photos of crane track installation problems every year. These pictures fully describe the installation problem, even if a solution is found, there is no need to go to the site. But we can provide a full range of diagnostic analysis, including observation operations, precise measurement investigations, paint thickness monitoring, metal hardness and composition analysis. To be precise, we have the technology to solve this problem.
- We can provide valuable understanding of the special needs of your industry.
- Crane track installation and design evaluation.
- If appropriate, it can be used as an alternative to new economic designs.
- Provide contract documents, such as summary reports on welding procedures and methods.
- Calculation aided design.
- Inspect and evaluate existing facilities.
For each project, whether it is a new or existing installation, we can conduct on-site investigations. The advantages of this kind of investigation can run through the entire process, including:
- Inspect the outstanding problems of railways and fasteners
- Partial damage/degradation identification
- Evaluate the new civil foundation to ensure that the horizontal tolerances meet the requirements
- Communicate with operators/drivers to investigate specific issues
中文
English
Россия
Deutsch
Français
Español
Português
العربية


































